Stage 3 Sections
Stage 3 sections offer generous sites right in the heart of Amberley. If you've been considering your next move, now is the time to act.
Stage 3 sections offer generous sites right in the heart of Amberley. If you've been considering your next move, now is the time to act.
Secure Your Section at The Clearing
State 3 Site Plan
Earthworks Engineering Design Drawings:
Sewer & Stormwater Engineering Design Drawings:
Roading Engineering Design Drawings:
Water & Services Engineering Design Drawings:
To receive the Agreement for Sale and Purchase, or for local building firm contacts, talk to Fiona McDonald or Greer Poulson of Ray White Morris and Co:
Status as at April 2026: Stage 3 in foreground looking towards stages 2 and 1 above.
Status as at April 2026: Stage 3, connecting to Stage 2 at the right.
Stage 3 looking towards Amberley Township
Secure your section with a 5% deposit.
Don’t miss out: please contact our exclusive listing agents for stage 3 sections: Fiona McDonald & Greer Poulson of Ray White Morris and Co.
Stage 3 Section sales are proudly represented by Fiona McDonald & Greer Poulsen of Ray White Morris and Co. To arrange a site visit (Stage 3 is an active construction site, and visits are strictly by appointment only), please contact Fiona or Greer as below:
Fiona McDonald: 021 030 7919 or email
Greer Poulsen: 027 528 3636 or email
Be the first to know about new collections and special offers.